Your feedback is an essential part of how we continually improve ProjectSight. You can use this page to submit new ideas, or vote on ideas from other users.
This portal is for suggesting enhancements only. If you are experiencing a product defect, please contact support.
Design documents used in an IPD workflow need to be reviewed by the Project Manager for approval to proceed, but are also necessary to view as early as possible during the BIM process. Drawing statuses assigned in the Drawing Set are not visible in the Drawing module. The Drawing module refers to Status as an option in the headers, but only shows if the drawing is current, not Pending Approval, etc.
The only way to publish a drawing from a Set to the Drawings module is to "Approve" it, which can be misleading in IPD. Here are a couple of suggestions to handle this situation...
1. Allow publishing of drawings with other statuses than Approved. For example, "For Review," or "Preliminary."
2. Allow the statuses to be changed in the Sets after publishing drawings.
3. Create a column that reflects the status of the Drawing Set in the drawing viewer.
4. Currently, once a Drawing Set is published, there is no way to unlock it. When selecting the Lock button, as in other parts of the app, a message pops up that says "The record is locked and cannot be updated."
5. As a side note, with the lock button not functioning after the status is set to closed, I accidentally had the drawings in the Set on the Pending status and published it. There is no way to change the status now, so the drawing can never be published.
Dear Viewpoint Suggestion Box contributor;
We at Viewpoint sincerely thank you for your contribution to Suggestion Box on how we can improve Viewpoint products. While we can’t do everything at once, we rely upon your feedback to help guide the prioritization of our product improvements, and Suggestion Box is a critical tool for us to understand and prioritize our customers’ needs.
Viewpoint reviews Suggestion Box regularly for all of our products and updates statuses, adds comments, and performs various house-keeping (including deleting) as needed to ensure that Suggestion Box is maintained as a productive environment for product enhancements requests.
© 2023 Trimble Inc. All Rights Reserved. Viewpoint®, Vista™, Spectrum®, ProContractor™, Jobpac Connect™, Viewpoint Team™, Viewpoint Analytics™, Viewpoint Field View™, Viewpoint Estimating™, Viewpoint For Projects™, Viewpoint HR Management™, Viewpoint Field Management™, Viewpoint Financial Controls™, Vista Field Service™, Spectrum Service Tech™, ViewpointOne™, ProjectSight® and Trimble Construction One™ are trademarks or registered trademarks of Trimble Inc. or its affiliates in the United States and other countries. Other names and brands may be claimed as the property of others.