Skip to Main Content
Coming Soon: On April 2nd, all Suggestion Boxes will be migrating to The Network, Trimble's online user community. Your posts, votes, comments, and user accounts will transfer. This site will become read-only after the migration, and this banner will have a link to the new location for ProjectSight suggestions.
6 Not supported for the current status
Status Shipped
Categories Drawings
Created by Jeff Young
Created on Nov 12, 2021
Merged idea
This idea has been merged into another idea. To comment or vote on this idea, please visit PSW-I-1581 Ability to unpublish drawings, and edit..

Ability for Admins change drawing numbers, revisions and letters after published Merged

Currently, once new drawings area scanned and published by Projectsight OCR you cannot change the drawing numbers and letters.

The problem is that OCR will read some zeros "0" but publish the drawings with an "O" and sometimes you end up with a "." period added before or after a drawing letter or number. Then, ProjectSight views these as 2 separate drawings when they are actually the same drawing.

An example your drawing number should be A1.0 but ProjectSight OCR reads the drawing as A1.O Another example is S1.1 but ProjectSight OCR scans as 51.1, S1.1. or .S1.1 The problem is now you have two drawings and they both will show current..

Yes, you can mark one drawing obsolete or delete one version but then you still have to upload the new version and manipulate the drawing number before it is published which is a pain.

The problem is that you normally do not find this issue until you look at the entire project drawing log that is published.

Project Admins should have the ability to manipulate the drawing numbers, revision numbers and letters after they are published and unlocked.