Skip to Main Content
Coming Soon: On April 2nd, all Suggestion Boxes will be migrating to The Network, Trimble's online user community. Your posts, votes, comments, and user accounts will transfer. This site will become read-only after the migration, and this banner will have a link to the new location for ProjectSight suggestions.
Categories Drawings
Created by Guest
Created on Jun 4, 2025

Drawing revision history should be in Chronological

When selecting a revision of a drawing on ProjectSight, the dropdown menu of each revision is presented as a list in alphanumeric order instead of Chronological order. Is there a way to change this so the dropdown can present revisions in a proper timeline?

Revisions are not necessarily titled in exact orders, as some consultants may use lettering, or "IFC" there should be an option to have revisions display in the order they were uploaded/issued. As it stands it is incredibly difficult to flip through the history of drawing changes, as it is alphanumerically sorted.

  • Attach files