Skip to Main Content
Update: This Suggestion Box has been migrated to The Network, Trimble's online user community and is now read-only. Please click the link to add a new idea, vote, or comment.
Categories Drawings
Created by Guest
Created on Jun 4, 2025

Drawing revision history should be in Chronological

When selecting a revision of a drawing on ProjectSight, the dropdown menu of each revision is presented as a list in alphanumeric order instead of Chronological order. Is there a way to change this so the dropdown can present revisions in a proper timeline?

Revisions are not necessarily titled in exact orders, as some consultants may use lettering, or "IFC" there should be an option to have revisions display in the order they were uploaded/issued. As it stands it is incredibly difficult to flip through the history of drawing changes, as it is alphanumerically sorted.

  • Attach files