Skip to Main Content
Coming Soon: On April 2nd, all Suggestion Boxes will be migrating to The Network, Trimble's online user community. Your posts, votes, comments, and user accounts will transfer. This site will become read-only after the migration, and this banner will have a link to the new location for ProjectSight suggestions.
Status Shipped
Categories Drawings
Created by Eric Bogenschutz
Created on Jun 13, 2019

Allow Revisions in the Drawing Module to be ordered and Superseded by "Revision Date" and not just the order than the drawing set was compiled

If somebody doesn't upload or create a Drawing Set in the correct order, I.E. They skipped or missed an issued package and have gone in and updated 5 subsequent packages that include a sheet that has been issued each time, when they realize that they missed an issued set, that "Old" or "Skipped" set will now supersede the 5 other packages that really should fall after. The only way to fix it would be to go redo any Drawing Sets that have occurred after and it would throw off the "How many times has sheet X been issued".

It would be beneficial if the order of Drawing Sets and drawings being superseded would follow the "Revision Date" of the sheet itself instead of just doing the subsequent Drawing Set Number.

  • Attach files
  • Dwain Wood
    May 2, 2023

    The Drawing Sets dropdown list in the Drawings module should match the list shown in Drawing Sets module. Right now it just puts them in alphanumeric order.